| <- Previous Page |
|
- Widen and reconstruct a rural 2 lane section to an urban 5 lane section
- Open drainage system to a closed system with two ponds
- Curb and Gutter and 5 ft. sidewalk
- Two new traffic signal assemblies and loops
- JPA to relocate 8" sanitary force main and 12" water main
|
- Client:
Hernando County
- Construction Cost: $2,570,000.00
|
|
|
|